Work Culture & Behind the Scenes

Google SRE-Style On-Call: Phased Onboarding, a Playbook per Alert, and Lessons from Evernote

Google's SRE Workbook shows how to run a healthy on-call rotation even for small teams: phased training, playbooks, SLOs and compensation.

By Oemah Solution Editorial 4 min read

This article was prepared with AI assistance from the official sources listed below, and checked automatically before publication.

Many small IT teams have to take turns watching over their systems outside working hours, without a large pool of people or a follow-the-sun rotation across time zones. The risks are clear: exhausted engineers, piling alerts and incidents that are hard to handle. Chapter 8 of the SRE Workbook, published by Google SRE, addresses this problem. It answers common objections such as "we're not Google, our team is much smaller", and gives real examples from a new SRE team at Google and from Evernote.

What healthy on-call means according to Google SRE

According to Google SRE, being on-call means being available for a set period and ready to respond to production incidents with appropriate urgency. During a shift, SREs diagnose, mitigate, fix or escalate incidents. The aim is to keep critical services covered without sacrificing engineers' wellbeing.

Some of the basic principles:

  • SREs spend at least 50% of their time on project work, leaving room to resolve the root causes of production problems strategically.
  • The target is a maximum of two incidents per shift, so there is time for follow-up. If the pager load is too high, corrective action is needed.
  • Psychological safety matters. Engineers need to be supported by clear procedures and escalation paths.
  • Work outside office hours should be compensated, for example with time off in lieu or cash. This compensation serves as an incentive, while also preventing engineers from taking too many shifts for financial reasons.

A practical example: a new team ready for on-call in three months

The chapter describes a new SRE team in Mountain View that had to be ready for on-call within three months. The team had seven people, four of them new hires. They took over three Google Apps services from a team in Kirkland, which continued to work alongside the team in London. Although relatively junior, the team cut machine costs by 40%, automated releases with canarying, and targeted 99.98% availability (about 26 minutes of downtime per quarter).

How they prepared:

  • A checklist of about two dozen training areas, for example draining traffic from a cluster, rolling back a faulty release, throttling unwanted traffic, adding capacity, using the monitoring systems, and explaining the service architecture and dependencies.
  • Service deep dives: walking through the monitoring consoles, identifying the jobs that are running, and trying to debug recent pages.
  • Wheel of Misfortune: role-playing real incidents to practise debugging. These sessions continued after the team was ready, with session leaders taking turns and sessions recorded for reference.
  • Learning from other teams: reading on-call handoffs and daily postmortems, attending weekly production meetings, and talking with the Kirkland and London teams.

The transition was gradual. After two months, senior members shadowed the previous team's shifts. In the third month, the new team became primary on-call and the previous team became backup. The shift rules were simple: read the previous shift's handoff at the start, prioritise minimising impact on users, and send a handoff email at the end.

Pitfalls to avoid

  • Noisy alerts. The chapter quotes a team that was paged about a hundred times per shift, so real problems were buried. Evernote addressed this by writing SLOs as the basis for alerts, so alerts moved to high-level indicators such as API responsiveness and the team stopped chasing transient problems.
  • Playbooks full of routine commands. A playbook is written for every alert. But if its content is just a series of deterministic commands that are always run, those steps should be automated.
  • Relying on logistics alone. Google stresses that a mathematically tidy rotation is not enough. Incentives and human nature also play a part.
  • Knowledge lost during handover. Written handoffs, postmortems and repeated practice help close knowledge gaps.

How to apply it for teams and clients

The principles apply beyond Google, including to small teams. Some steps you can take:

  • Draw up a checklist of skills that must be mastered before someone joins the rotation, then measure readiness with incident simulation exercises.
  • Introduce a shadowing period before a new member becomes primary on-call.
  • Require a written handoff at every shift change.
  • Write a playbook for every alert, and automate steps that are always the same.
  • Define SLOs together with service owners so that alerts focus on user impact.
  • Agree on fair compensation from the institution or company for work outside office hours.

For IT managers and public-sector officials, this chapter provides a framework for discussion with service providers: how often incidents occur per shift, how new engineers are trained, and what happens when an alert fires. Evernote, for example, combines a 24/7 weekly rotation with an incident review every morning at the daily stand-up. Questions like these help keep public services reliable without overburdening the people who look after them.

#on-call#sre#incident-management#playbook#work-culture

Sources & references

This article is a summary and interpretation by the Oemah Solution team of the sources below. Refer to the original sources for full details and context.

  1. Google SRE: What it Means Being On-Call? | Devops On-Call Google SRE (SRE Workbook, Bab 8) · sre.google